PSDP - 2019- 20 (479 Construction of Boxing Gymnasium at PSB Coaching Centre Karachi)

 

G.Sl.

No.

Name of Project

Approval Status

Estimated Cost

Expenditure

upto 30.06.2019

Throw-

forward 01.07.2019

Allocation 2019-20

Total

Foreign

Aid

Foreign

Aid

Rupee

Total

1

2

3

4

5

6

7

8

9

10

479 Construction of Boxing Gymnasium at PSB Coaching Centre Karachi

CDWP 19.03.2018

133.671

0.000

124.755

8.916

0.000

8.916

8.916